This is a challenging custom build for a client who wanted a curved box with constrained layer damping on the side panels. A difficult combination!
Front baffle. Fixing the depth of holes for the neo magnets. Grille will be attached by concealed magnets.
Bottom panel which holds the down firing port.
Applying bitumen to internals of some of the panels.
Gluing base panels together.
Bottom panel accommodates a panel that screws in. This allows access
to the port and crossover which will be installed in the base.
The thin
segments here nest better for machining, but in hindsight it wasn't
worth the extra trouble just to save on MDF in a project that
unavoidably wastes a great deal of material.
Ribs about to be glued together:
Assembling rib sections. Dowells lock them together and align the ribs.
Outside ribs:
Ribs temporarily placed over bottom of speaker:
You can see burn marks at the centre of each rib, where the tool starts and ends each cut. A compromise must be chosen in setting up the CNC tool paths. In future it will be done differently (this is the first box with more to follow).
The holes for the dowells weren't quite big enough, so a custom tool was made to bore them concentrically.
Rib segments (20 per speaker) are clamped after assembly.
All segments glued together:
Sanding the internal surface to ensure a tight fit with the rubber sheet that will be used as the constrained layer:
Segments after sanding:
These are simply for one box!


































